Tuesday, November 03, 2020

Maynilad installed 11022020.

Installed additional Maynilad meter at 116 Miranda Cpd.

Initial cost punta maynilad for application

Php500.00 brg clerance pamasahe.

Php2000.00 labor

Php1000.00 attorney fee

Php5289.47 installation charge

Php5289.47 installation charge

Php5289.47 installation charge

Php900 sa water pipe elbow.

Ttl gastos = 19368.41

Tapos na din sa wakas.














No comments: